Friday, March 27, 2009

Friday Frame Build

Tonight Kate & John met up to cut and weld the frame. The team decided to make the structure out of 1.25 x 1/16'' wall square steel tube. First step of the night was to cut all the pieces to length and then grind & wire brush prep them for welding.

John, griding the piece to finish

Once all the pieces were cut it was time to lay them out and get welding! Its important to sequence your welds so that the thermal expansion from heating up the steel wont warp your final dimensions. 
Kate laying out the initial perimeter

John about to make the first tack

John running the first bead.

Finished wheel frame, nice and square

Kate doing a final inspection on the squareness of the frame.

 What a way to spend a Friday night! Kate and John got just about all of the frame welded, all that is left is the steering braces and then its ready for trussing! Tomorrow its a trip to the motorcycle  salvage yard, more wheel treadin & welding!